Work speeds up on road, water, power and drainage projects in Kohlu

KOHLU: Development projects in the district have been speeded up on the directive of Member of the Provincial Assembly Nawab Changez Marri.
Work has begun in phases on a number of projects for the welfare of the people and the provision of basic facilities. They include transport links, uninterrupted electricity supply, filtration and boring schemes for clean drinking water, basic health facilities, and durable construction of streets and drains in urban and rural areas.
The main aim of the projects is to find lasting solutions to the everyday problems of the people and to give citizens a better standard of living.
The construction and rehabilitation of roads linking the district with other Districts, including the Kohlu-Sibi road, will ease travel for the people and boost economic and trade activity.
Projects to lay paving tiles in streets and drains and to rebuild them in urban and rural areas of Kohlu tehsil and Mawand tehsil are making the drainage system more effective. The aim is to ensure cleanliness and a better environment.
The MPA stressed firm measures to ensure transparency, quality and timely completion of all projects. Clear directions have been issued to the departments concerned to carry out the schemes to the set standard. No negligence or carelessness will be tolerated.
Citizens of Kohlu praised the people-friendly policies of Nawab Changez Marri, the FC Balochistan and the district administration. They said that starting work with full resolve to solve public problems was a positive step.
The citizens thanked the MPA for solving basic problems on a priority basis. They said the benefits of the development projects would soon reach the people, helping to achieve the goals of overall development in the district, better facilities and public welfare.











