Commissioner Salahuddin Nazrani Oversees Revival of Nasirabad Circuit House

The Circuit House in Nasirabad Division was built in 2017, but for a long time its construction and repair work stalled. The devastating rains of 2022 left the Circuit House non-functional. With repair work halted, bushes grew around the building, the sewerage system failed, and the roads also fell into disrepair.
However, after Salahuddin Nazrani took up his post as Commissioner of Nasirabad Division in July 2025, he made the restoration of the Circuit House his first priority and has begun practical steps to equip it with modern facilities.
Measures taken at the Circuit House include the installation of tuff tiles, the repair and renovation of suites and other rooms, refurbishment, and the restoration of the air conditioning system. Work has also been carried out to improve the dining area, conference hall and lawn, so that the Circuit House can be kept operational with better facilities.
The ongoing measures to restore the Nasirabad Circuit House are an important step towards improving government buildings and making effective use of available resources.











