رَّبِّ ارْحَمْهُمَا كَمَا رَبَّيَانِي صَغِيرًا My Lord, have mercy upon them as they brought me up when I was small Bani Israil 24
Quetta 9° Partly cloudy 19° / 8°Fajr 5:39 amDhuhr 12:18 pmAsr 3:57 pmMaghrib 5:33 pmIsha 6:57 pm
The voice of Balochistan, since October 1970Published from Quetta · Editor-in-Chief: Javid Ahmad · Editor: Kamran Javid
Home› Balochistan ›Kalat

Deputy Commissioner Engineer Aisha Zehri Inspects Mughalzai-Kuanag Road Construction Work

Deputy Commissioner Engineer Aisha Zehri Inspects Mughalzai-Kuanag Road Construction Work
File photo: courtesy dailyindependent.com.pk

Qalat, November 20: Deputy Commissioner Engineer Aisha Zehri conducted a detailed inspection of the Mughalzai to Kuanag blacktop road construction work under the BSDI programme.

On the occasion, SDO Roads Engineer Naveed Musiani briefed the deputy commissioner in detail on the ongoing construction, progress and other technical matters related to the road.

The deputy commissioner reviewed the pace and quality of the road construction closely and directed the relevant authorities to complete the project within the stipulated time and to high quality standards.

The deputy commissioner said the main objective of development projects under the BSDI programme is to provide better travel facilities to the public and meet the basic needs of the area.

The construction of the Mughalzai to Kuanag road will reduce the difficulties residents face in travelling and will give the local population better transport facilities.

She made clear that no compromise would be tolerated on quality or transparency in development projects, and that continuous monitoring of the work would be ensured.

Advertisement